Enquiry No. : 5090439 Chittagong (Bangladesh)
Description :Dear Sir/Madam,
In this regard, please be informed that recently one of
our valued clients is interested to set up a 50 MW
Gas Turbine Power Plant for commercial purpose of
the following specification:
Plant Type: Gas Turbine Power Plant including substation
and distribution system (For Commercial Purpose).
Raw Material: Natural Gas
Natural Gas Specification: Attached
Power Production Capacity: 50 MW.
Electric Substation & Distribution System (33KV/11 KV):
To supply the power to the national grid.
Frequency: 50Hz.
Include the Followings:
I. H.T (High Tension) and M.T. (Medium Tension).
II. Switch gear & Distribution system.
III. Earthing system & all accessories of the substation.
IV. All protective devices for safe operation of the
substation & distribution.
Therefore, considering above kindly provide us your
complete proposal with most competitive price CFR
Chittagong basis for 50 MW Gas Turbine Power Plant
including distribution system as early as possible.
If you require detailed clarification in any aspect, please
do not hesitate to contact us as and when required.
Thanks and best regards. Looking forward to a
prospective co-operation for the above mentioned plant
at your soonest convenience.
Sales and Project Engineer