Enquiry No. : 8121825 Seoul (Korea)
Description :#51172-O8. SMS Line Pipe API 5L X52
The above number appears on all quotation and related correspondence.
We have new requirement for Line Pipe as per attached & request you
to please quote your best price on following:
1- Prices CIF Dubai required by December 31, 2008.
2-Advise your best delivery.
3-Offer valid for 105 days from quote date.
4- Manufacturer Name & Country of Origin.
5- Type of Packing.
6- Est. Weight & Volume of shipment.
7- Technical Data of quoted product.
8- Product Guarantee.
9- Any deviation for specification to be clearly stated & supported by
documents.
Item Descriptions
Line Pipe
1 API 5L X52, PSL2, seamless according to API 5l (42nd edition)
and IPS-M-190(2) 17,400
Latest edition suitable for sour conditions.
Electric furnace or open hearth steel or basic oxygen steel.
Ends bevelled at an angle of 30 deg. ( +5) deg (-)' 0' deg.
supplied bare and un oiled in random lengths of ave. 11.6 meter ave.
Min. 10 meter max. 12.8 meter.
Colour coding green, 2 in. (50mm) daub paint on inside surface at
both ends.
Size: 16 in. Nom x 9.52 mm wall thickness
Notes:
1. Inspection certificate and manufacturing documents as specified in
IPS- M- PI- 190 (2) and API 5LX is required.
2. The above item have to be manufactured in accordance with nace
standard # MR-01-75.
3. Scope of inspection KSI NO. 60 applicable to this enquiry as below
Scope Of Inspection KSI NO. 60
Seamless Pipe & Tube
01- Technical Inspection shall be carried out to ensure that the material
supplied are fully in compliance with the purchase order specification,
reference standards and technical data.
02- Verification of QA plan and checking mill and QC system.
03- Visual & Dimensional Checks.
04- Mill Test Certificate to be verified and reviewed.
05- Physical, mechanical and chemical properties to be witness tested as
per relevant std.
06- Gauges, threads, tolerances, bevels, thread/ bevel protector, straightness,
ovality and wall thickness uniformity, to be checked.
07- Monitor N.D. test on body acc. to relevant Std and required supplementary
spec.
08- Witness hydrostatic / eddy current test in accordance with specification.
09- Heat treatment charts and/ or certificates to be verified and reviewed.
10- Checking the material to be free from corrosion (scattered pitting, scale
and etc.) and mechanical deformation.
11- Witness packing, marking & loading ex- works and on vessel/ truck.
12- Progress reports to be issued each month.
13- Issue Certificate & Detailed inspection report.
Looking forward to hearing from you soon.
Best regards