Enquiry No. : 7071238 Lahore (Pakistan)
Description :We would like to import coal to Pakistan,
The market presently in Pakistan for Indonesian coal is around
3 million tons per year and is growing by the rate of 20% every
year due to the boom in local cement sector of Pakistan.
The cement manufactured in Pakistan is being exported to
Afghanistan, Dubai, etc and due to the expansion taking
place in the cement sector of Pakistan, more coal is required.
Please get back to us by email; so that we can send you
more details on our requirements. We would also like a quote
for your most competitive rates and also the commission
terms for our firm as your local agent in Pakistan. Following
are some of the technical specification of the coal (on air dry
basis) on ISO standards unless, otherwise stated (except sulpher
and HGI in ASTM) that we require.
Port of discharge is Karachi port trust or port Qasim at Karachi,
Pakistan
Quantity required is 50, 000 MT per shipment
Total moisture (ARB) : 8% , rejection-
Inherent Moisture: 2 to 4% , rejection above 4. 5%
Ash: 15% max, rejection above 16%
Volatile meter: 22 to 28% , rejection above 29%
Gross calorific value: 6600 Kcal / KG, rejection below
6400 Kcal/ kg
Sulpher: 1. 0% max, rejection above 1. 0%
HGI: 50 to 55, rejection below 50
Size: 0 to 50 mm, rejection-